Pioneer CTC Phased Improvements
Client: Pioneer Career & Technology Center
Location: Shelby, Ohio
- Reprogrammed 236,000sf of existing space.
- A 15,000sf addition.
- Low and high bay spaces designed to accommodate over 30 different programs.
- Exterior reskin with contemporary materials to create a technically sophisticated image.
Interesting Fact: The phased project required the coordination of swing space to enable the building to stay operational during construction.
Architecture|Interior Design|Engineering
This five-phased $25M project required careful planning and implementation of flexible spaces, allowing the center to better utilize the existing buildings to meet area workforce development needs. The project was a complete reimagination of what a learning facility could look like within an industrial complex.