Lockland K-12 School
Client: Lockland Local Schools
Location: Lockland, Ohio
- Renovation and partial demolition of a K-12 school.
- Complete interior reprogramming to support flexible learning communities.
- Modern finishes and furniture selections that enhance education.
- The conversion of a natatorium into an open student dining commons.
- Preservation of the historic building structure and character.
Learning Never Missed a Beat: To keep students safely learning inside the building during construction, our team engineered a meticulous utility and phasing plan that backfed the boiler plant and rerouted water, gas, and electricity right through active demolition zones.
Architecture|
Lockland Schools partnered with SHP to modernize its campus while preserving the historic character of its K-12 facility, originally built in 1912. Through a carefully planned renovation and partial demolition, the team maintained continuous school operations throughout construction. The resulting design completely reorganizes the interior, balancing historic preservation with the everyday functionality and adaptability needed by students and staff.